Work Table Build Day - Saturday, March 2nd, 2019, 11:00 AM - 5:00 PM

Time for another work table build day!

Date and time: Saturday, March 2nd, 2019, 11:00 AM - 5:00 PM

Please come in and help out! The remaining work list for each table is below, The goal for this weekend will be to finish the three tables that have been started, though drying times for paint and varnish mean that the finishing may lapse over to next week while we work on getting the next two table frames welded up.

Thanks everyone for your help keeping the progress on these moving forward!

  • Kevin M.

Big Work Table #1:

  • 2nd coat of varnish

  • 3rd coat of varnish

  • Touch up paint
    Standing Welding Table:

  • Bolt and shim top to frame

  • Clean and oil top

  • Cut shelf and round over edges

  • Drill shelf mounting holes in frame

  • Pre-drill shelf and install

  • 1st coat of varnish on shelf

  • 2nd coat of varnish on shelf

  • 3rd coat of varnish on shelf

  • Touch up paint

Big Work Table #2:

  • Grind down welds in way of shelf, top, and paper mounts

  • Drill shelf, top, and paper mounting holes in frame

  • Wire brush welds, and wipe frame with acetone to prep for paint

  • Paint frame black

  • Cut shelf and round over edges

  • Pre-drill shelf and install

  • Pre-drill bottom layer of top and install

  • Drill paper mounts and install

  • Glue top layer onto top

  • Flush trim top layers

  • Round top corners and edges

  • 1st coat of varnish

  • 2nd coat of varnish

  • 3rd coat of varnish

  • Touch up paint

  • Install tube caps

  • Cut and thread pipe for paper roll

  • Install paper roll
    Fab Lab Work Table: (not yet started)

  • Weld top frame

  • Weld bottom frame

  • Weld top, bottom, legs, and supports together

  • Tack on casters

  • Grind down welds in way of shelf and top

  • Drill shelf and top mounting holes in frame

  • Wire brush welds, and wipe frame with acetone to prep for paint

  • Paint frame black

  • Cut shelf and round over edges

  • Cut both layers of top

  • Pre-drill shelf and install

  • Pre-drill bottom layer of top and install

  • Glue top layer onto top

  • Flush trim top layers

  • Round top corners and edges

  • 1st coat of varnish

  • 2nd coat of varnish

  • 3rd coat of varnish

  • Touch up paint
    Sitting Welding Table: (not yet started)

  • Weld top frame

  • Weld bottom frame

  • Weld top, bottom, legs, and supports together

  • Tack on casters

  • Grind down welds in way of shelf and top

  • Drill shelf and top mounting holes in frame

  • Wire brush welds, and wipe frame with acetone to prep for paint

  • Paint frame black

  • Bolt and shim top to frame

  • Cut shelf and round over edges

  • Countersink holes in top

  • Pre-drill shelf and install

  • Break sharp corners and edges on top

  • Clean and oil top

  • 1st coat of varnish on shelf

  • 2nd coat of varnish on shelf

  • 3rd coat of varnish on shelf

  • Touch up paint

Dave and I are here working, hope to see a few more people before the day is out!

Should be out there in a bit.

Brad