Sidewalk deconstruction

Hi all,

I stopped by this morning, and it looks like they finally got around to doing whatever it is they’re doing with the sidewalk. I talked to one guy, and he said he will be leaving the tile in front of the door until the end of the week, and once they start getting supplies they will put down some plywood to get in.

Thought I would give everyone a heads up. =]

Here’s a picture because why not?

20151020_104543.jpg