Looking for a few good Hive13 Volunteers to commit to get this done.
Steps to move the laser.
Power in 2701 - I’m working on this today 7/5/2020
Drain and Dismantle plumbing for chiller.
Dismantle air pumps
Dismantle Small Laser - Protect tube and CPU
Dismantle exhaust
Dismantle Big Laser - Remove bars, tube maybe mirrors
Take down door and part of wall - Move the Laser to the hall. Put the door back - NEED A GOOD FINISH CARPENTER - I did it before, now it’s someone elses turn.
Arrange for a flat bed truck. Will pallet jack work or do we need to have Garden Street lift it with a fork lift?
Arrange to move through the Printers space to the truck. (weekday)
Move into 2701
Put it all back together
Align the laser
Make Stuff
That is a big list.
I’m asking too. Who are the volunteers who will commit to getting this done?
Y’all like the laser? Y’all want to use it again? Chime in and say I’m in.
Could we do this later this week?
Steps to move the laser.
Power in 2701 - I’m working on this today
Drain and Dismantle plumbing for chiller.
Dismantle air pumps
Dismantle Small Laser - Protect tube and CPU
Dismantle exhaust
Dismantle Big Laser - Remove bars, tube maybe mirrors
Take down door and part of wall
Arrange for a flat bed truck.
Arrange to move through the Printers space to the truck. (weekday)
I’m asking too. Who are the volunteers who will commit to getting this done?
Y’all like the laser? Y’all want to use it again? Chime in and say I’m in.
I’ll be showing up with the flatbed truck around 6:30pm Thursday. I have other tasks that I’d like to get done Thursday evening (moving all the glass stuff), so I would very much appreciate it if, when I show up at 6:30, the big laser was on the back dock, ready to be loaded and carried over to 2701.