CLEAN UP SATURDAY UPDATE **
2-8-25 - 10 am ish until whenever you need to leave.
Mike O will be leading the charge this weekend and he will be onsite from about 10 am until 2 pm. If you can only be here later than that John C will be around to help after Mike needs to leave.
Updated todo list items with priorities listed in order:
- Prep for Floor painting in the CNC area
- Vacuum the floor
- Wet mop the floor with clean water (Change water often)
- Let dry
- Coat the floor with sealer/primer
- Move power tool drag racing items from near the OG restroom to the back of the hive. (See attached photo)
- Move brewing equipment from the wall
- Move all items including banners and graphics
- Place them in the highlighted area in the photo
- Sweep the floor where the items were.
- Add OSB to the last member storage rack
- Cut List for Decking IJKL racks.
- Rack IJKL 7-12 is a 48 x 96 rack. Put the two full sheets on this rack on the lower shelves.
- The rest will be done with salvaged OSB sheets in smaller sizes.
- Pieced together to finish the decks. The OSB is leaning against the South Wall on the Left as you pass through the tarp to the back.
- Deck the top of IJKL 7-12 with qty 1 38.5" x 86.5" OSB standing up on the south wall.
- Cut two 9.5" x 86.5" strips and splice one to finish the 48" width
- Deck IJKL with the rest of the 38’5x86.5 OSB - Cut one sheet into qty 4 6"x86.5" strips and another sheet into qty 4 9.5"x86.5" strips to
- Attach to stringers with drywall screws. Make surfaces level.
- Empty the Skid bin into the trash compactor and return the skid back to the dungeon
- Vacuum EVERYTHING! Ductwork, Light fixtures, Floors, Walls, windows.
- Clean windows
- Vacuum
- Wash (Squeegee and window mop are on the ledge by the washer and dryer